How to install the Qatar AC power supply so that it can function as a protection switch?(1)
How to install the Qatar AC 48V input power supply so that it can function as a protection switch?
(3) Before the installation is completed and the power is turned on, the wiring on each terminal should be checked and checked again to ensure that the input and output, AC and DC, single-phase and multi-phase, positive and negative, voltage and current values are correct. Prevent the occurrence of reverse and wrong connections.
(4) For high-power power supplies, there are generally two or more "+" output terminals and "-" output terminals. In fact, they belong to the same output electrode, but for the convenience of user wiring, they are connected together internally.
(5) The module power supply is not allowed to work at full load for a long time. The utilization rate of linear power supply should be controlled within 60%; the utilization rate of switching power supply should be controlled within 80%, otherwise it may cause early artificial failure of module power supply.
Since the air switch and the leakage switch do not have protective functions, when the 48V input power supply is abnormal, a large number of electrical equipment will be damaged. When these accidents occur, it is only necessary to disconnect the 48V input power supply when the 48V input power supply is abnormal, so as not to damage the electrical equipment.
Qatar The three-phase AC power intelligent protector has major electrical fault protection functions such as overvoltage, low voltage, neutral wire disconnection, short circuit, phase loss/opening, etc., and has fault identification, fault indication, voltage before closing, neutral live wire reverse connection, Zero line disconnection, phase loss/phase failure detection, remote monitoring, online parameter modification and software upgrade functions.